How to Apply for Solar ATAP

From eligibility check to system commissioning in 4 straightforward steps

1

Check Eligibility & Prepare Documents

Before applying, verify that you meet all eligibility criteria. You must be a registered TNB consumer in Peninsula Malaysia, not have existing solar installations (or be willing to terminate them), and not operate multi-tenant properties. Review your electricity consumption history to determine appropriate system size. Gather required documents including your MyKad/business registration, latest electricity bill, and property documents.

Key Actions:

  • Verify eligibility criteria on our eligibility checker
  • Review your monthly electricity consumption and billing history
  • Determine suitable system size based on your consumption
  • Gather required documents (ID, utility bills, property papers)
  • Research solar technology and equipment options
  • Set your budget and explore financing options
2

Partner with ERS Energy

ERS Energy is your trusted SEDA Malaysia Registered PV Service Provider (RPVSP) for Solar ATAP installations. With years of experience and thousands of successful installations, we design and install high-quality solar systems tailored to your specific needs. Our team holds all necessary certifications including Suruhanjaya Tenaga electrical contractor licenses.

Why Choose ERS Energy:

  • SEDA Malaysia Registered PV Service Provider (RPVSP)
  • Experienced with Solar ATAP applications and requirements
  • Competitive pricing with transparent quotations
  • Premium equipment brands with comprehensive warranties
  • Professional installation by certified technicians
  • Dedicated after-sales support and maintenance
  • End-to-end service from consultation to commissioning
3

Submit Application to SEDA Malaysia

Your chosen installer will help prepare the complete application package. This includes the application form, technical drawings, certificates, and supporting documents. For systems over 5kW (single phase) or 15kW (three phase) for domestic, or over 72kW for non-domestic, you'll need a Connection Confirmation Check (CCC) or Connection Assessment Study (CAS). Submit your application through SEDA's eATAP online system with the required fees (RM7.50 per kW) and complete it no later than 3 months after submission.

Key Actions:

  • Complete Solar ATAP application form with installer
  • Submit required supporting documents
  • Pay application fee (RM7.50 per kW)
  • Obtain CCC/CAS approval if required for your system size
  • Complete your application within 3 months from your submission
  • Upon approval, sign Solar ATAP Contract with TNB
  • Obtain Suruhanjaya Tenaga generation license if required (>24kW single phase or >72kW three phase)
4

Install, Commission & Start Saving

18 months maximum

Once approved, you have 18 months to complete installation. Your installer will mount the panels, install inverters and metering equipment, conduct testing and commissioning, and submit completion certificates. TNB will install the bi-directional meter. After final inspection and system activation, you start generating clean energy and earning bill credits immediately. Your 10-year Solar ATAP contract begins from meter installation date.

Key Actions:

  • Schedule installation with your approved installer
  • Installation of solar panels, inverters, and equipment (1-4 weeks)
  • Complete testing & commissioning by Competent Person
  • Submit completion certificates and test reports to TNB
  • TNB installs bi-directional meter
  • Final system activation and grid connection
  • System goes live - start generating and earning credits!
  • Notify SEDA of Commercial Operation Date

Required Documents Checklist

Prepare these documents before starting your application

For Individuals (Domestic)

  • Copy of MyKad (front and back)
  • Latest TNB electricity bill
  • Property ownership document or rental agreement
  • Site photos and location map
  • Roof plan/layout drawing

For Businesses (Non-Domestic)

  • SSM business registration certificate
  • Form 9 / Form 24 / Form 49
  • Latest TNB electricity bill
  • Company authorization letter
  • Property ownership or lease agreement
  • Site photos and building plans